Calculate Your Workforce Productivity ROI — 30 Seconds, No Email Yet

See instantly: what your team's productivity gap is worth — in rupees, per year. Then decide if a 15-min demo is worth your time.

Anonymous No credit card Composite India dev cost benchmarks 2026

Your inputs

Change any field — the numbers update live. No submit button. Nothing is sent until you choose to email yourself the PDF.

10 – 1000 employees
Drives base cost multiplier
Drives productivity-lift factor
Annual workforce cost
Blended fresher + senior, 12 mo
Productivity intelligence lift
18% × industry factor
Meeting-load recovery
4 hr/wk × 50 wk × hourly
Attrition prevention
1% reduction × 60% replacement
Total annual recovery
ROI vs gStride ₹25k/mo
return multiplier

Want the full ROI breakdown emailed to you?

Per-team-member math + meeting-load audit framework + 30-day pilot deployment plan. PDF, in your inbox in 30 seconds.

15-min · Demo

Book a 15-min demo with your numbers

Walk through your live calc output with the founder. No slides, no credit card.

Book a slot →
L4 · Self-audit

Download the 5-Signal Self-Audit (PDF)

30-min audit on your own team using the five behaviour signals — before any demo.

Methodology · Blog

Read the Indian dev cost methodology

How the city multipliers and ₹25,000/month ceiling were built — composite benchmarks 2026.

Read the breakdown →

How we calculated this

Four composite anchors — disclosed in full so you can challenge any of them.

01 · City multiplier

Ahmedabad = 1.0× base. Pune 1.15×, Hyderabad 1.18×, Delhi NCR 1.32×, Mumbai 1.32×, Bangalore 1.4×, Other India 1.05×. Composite from advisor interviews + listing data 2026.

02 · Base cost

Ahmedabad fresher anchor: ₹50,000/month. Senior anchor: ₹2,50,000/month. Blended midpoint applied per employee, 12 months/year.

03 · Productivity lift

18% throughput lift baseline observed on small Indian IT teams running gStride pilots × industry factor (IT 1.0, SaaS 1.2, BPO 0.85, Consulting 1.15, Fintech 1.25). Composite, not customer-specific.

04 · Meeting + attrition

Meeting recovery: 4 hr/week × 50 weeks × employee count × blended hourly rate. Attrition prevention: 1% reduction × 60% replacement-cost recovery × blended annual cost.

Composite benchmarks from advisor interviews 2026 — not specific customer data. Calibrate to your team's role mix before treating any single number as a decision boundary. Full methodology in the Indian dev cost breakdown.